Jeita Country Club
| Project name : Jeita Country Club |
|
|
Client name : Jeita Country Club
Project type : Water / Mechanical Services / Roads / Reservoirs / Pipelines / Heating
Chillers/ Fire Fighting /Irrigation.
Consultant : Associated Mechanical Engineers
Execution period : 2000 - 2003
|
Brief description :
Execution of the pipelines works.
Supply and install complete mechanical works.
Execution of the drainage, sanitary and water works pertaining to the project. Supply of the required parts for the project including:
- Approx. 2190 bathrooms as follows:
- 1405 family cabins with its bathrooms
- 240 chalets simple, double and triple
- 100 bathrooms and showers in the lockers area
- 30 bathrooms and more in the public area
- 10 showers and more in the pools area
- 6 bathrooms in 2 restaurants and 2 Hawaiian bars
- 10 villas including 2 kitchens, bars, Jacuzzi and more than 4 bathrooms each.
- Olympic swimming pool
- Aqua City for children
- 7000 m2 micro-climate in an exotic universe
- 10.000 m2 for the club activities including bowling, billiards, shooting, ping pong, gymnasium, physiotherapy, baby care, squash, Jacuzzis, sauna, Turkish bath,
dancing halls, business area ..
Supply and install the heating system.
Supply and install the fire fighting system for the project.
Execution of the irrigation works over approximatively 120.000 m2 of greenery and exotic plants. |
Complete design work, shop drawings, survey works, as built drawings and maintenance manuals.
Complete all other works as detailed in the contract specifications including test commission and handing over of the complete project.
Maintenance works till today |
 |
| Tabarja Beach |
Top |
 |
Project name : Tabarja Beach
Client name : Nassif Jabbour
Project type : Water / Mechanical Services / Roads / Reservoirs / Pipelines / Swimming Pools / Heating / Fire Fighting / Irrigation.
Consultant : Bureau Hrant Zavzavagian
Execution period : 1980 - 1986
Brief description :
Execution of the pipelines works
Supply and install complete mechanical works
Execution of the drainage, sanitary and water works pertaining to The project.
Supply of the required parts for the project including:
- Approx. 2100 bathrooms as follows:
- 750 cabins with its bath cabinets
- 480 chalets
- 84 apartments (150m2 )
- 140 bungalows simple and double
- 100 bathrooms in the public area
- 30 showers and more in the pools area
- 12 bathrooms and more in 4 restaurants and 5 bars
- 4 bathrooms and more in 2 night-clubs
- 4 Olympic swimming pools
- 4 children pools
- 1 micro-climate
- Jacuzzis, sauna, dancing halls, gymnasium..
|
|
Supply and install the heating system
Supply and install the fire fighting system
Execution of the irrigation works over approximatively 90.000 m2 of greenery.
Complete design work, shop drawings, survey works and as built drawings.
Maintenance works till today. |
 |
| Halat Sur Mer |
Top |
 |
Project name : Halat Sur Mer
Client name : Michel Murr
Project type : Water / Mechanical Services / Heating / Roads /Reservoirs / Pipelines/ Fire Fighting / Irrigation.
Brief description :
Supply and install overhead lines including complete equipment.
Execution of the pipelines works.
Supply and install complete mechanical works.
Execution of the drainage, sanitary and water works pertaining to the project.
Supply of the required parts for the project including:
- Approx. 800 bathrooms as follows:
- 278 chalets double
- 20 bathrooms in the public area
- 10 showers and more in the pools area
- 16 bathrooms and more in 4 restaurants
- 4 bathroms in a night-club
- Olympic swimming pool
- Children pool
- Jacuzzis, sauna, dancing halls, gymnasium..
|
Supply and install the heating system.
Supply and install the fire fighting system.
Execution of the irrigation works for the project.
Complete design work, shop drawings, survey works and as built drawings. |
 |
| Voile Bleue I |
Top |
 |
Project name : Voile Bleue - Jbeil
Client name : Voile Bleue
Project type : Water / Mechanical Services / Pipelines / Heating.
Consultant : Bureau Sobhi Hamati
Execution period : March 2002 - May 2002
Brief description :
Execution of the pipelines works over 15.000 m2 .
Supply and install complete mechanical works.
Execution of the drainage, sanitary and water works pertaining to the project.
Supply of the required parts for the project including:
- Appr. 50 bathrooms as follows:
- 50 cabins
- 20 bath cabinets
- 20 bathrooms in the public area
- 10 showers in the pools area
- 2 restaurants
- Swimming pool
- Children pool
|
Supply and install the Heating system.
Complete design work, shop drawings, survey works, as built drawings and maintenance manuals.
Maintenance works till today. |
 |
| Voile Bleue II |
Top |
 |
Project name : Voile Bleue - Rmeileh
Client name : Voile Bleue
Project type : Water / Mechanical Services / Pipelines / Heating.
Consultant : Bureau Sobhi Hamati
Execution period : March 2002 - May 2002
Brief description :
Execution of the pipelines works over 11.000 m2 .
Supply and install complete mechanical works.
Execution of the drainage, sanitary and water works pertaining to the project.
Supply of the required parts for the project including:
- Appr. 50 bathrooms as follows:
- 50 cabins
- 20 bath cabinets
- 20 bathrooms in the public area
- 10 showers in the pools area
- 2 restaurants
- Swimming pool
- Children pool
|
|
Supply and install the Heating system.
Complete design work, shop drawings, survey works, as built drawings and maintenance manuals.
Maintenance works till today. |
 |
| Emilton Hotel |
Top |
 |
Project name : Emilton Hotel
Client name : Rene Mouawad
Project type : Water / Electrical / Mechanical Services / Swimming Pools / HVAC / Chillers/ Heating / Fire Fighting /Irrigation.
Consultant : Bureau Habib Kharsa
Execution period : 1997 - 1998
Brief description :
Supply and install complete electrical, mechanical and control equipments necessary for the project.
Execution of the complete sanitary, drainage and water works for the 4 stars hotel and resort which includes:
- Approx. 80 bathrooms as follows:
- 50 rooms
- 10 and more in the cabins area
- 10 bathrooms and more in the public area
- 8 bathrooms in 2 restaurants and 2 bars
- Olympic swimming pool
Supply and install the heating system.
Supply and install the fire fighting system and fire alarm control in the project.
Supply and install Chillers, Air Handling Units, Fan Coil Units and Fans.
Execution of the irrigation works in the project.
|
|
Complete design work, shop drawings, survey works, as built drawings and maintenance manuals.
Complete all other works as detailed in the contract specifications including test commission and handing over of the complete project.
Maintenance works till today. |
 |
| Duroy Hotel |
Top |
 |
Project name : Duroy Hotel
Client name : Rene Mouawad
Project type : Water / Mechanical works
Consultant : Beam Construction
Execution period : 1998
Brief description :
Execution of the pipelines works.
Supply and install complete mechanical works
Execution of the drainage, sanitary and water works pertaining to the project.
Supply of the required parts for the project including:
- Approx. 90 bathrooms as follows:
- 80 rooms
- Restaurant
Supply and install the heating system. |
 |
|
|
|
 |
Complete design work, shop drawings, survey works and as built drawings.
Maintenance works till today. |
|
|
|